Rate Analysis of Concrete – Explanation

Assume We need 1 m3 of wet volume concrete of M25 Mix, (Mix Ratio, M25 = 1: 1 : 2) So Total Parts = 1+1+2 = 4 Parts which gives Dry volume that means before adding water content. Volume of concrete = (1 Cement Part)/4 + (1 Sand Part)/4 + (2 Coarse Aggregate Part)/4. From the IS Code standard, Assuming the water-cement ratio for M20 is 0.5.

cement grade crushers

The workability of grade M20 concrete in both the cases was approximately the same. • The strength of M30 grade concrete cast using crushed sand was observed to be 25.52% more than M30 grade concrete cast using natural sand, whereas the percentage increase in cement consumption per cubic meter of concrete was observed to be 4.98%.

Unit Weight of concrete in kg/m3, kg/ft3, kN/m3, lbs/ft3 and lbs/in3

Generally, unit weight of concrete is range from 2400 to 2500 kg/m3 measured in kilogram per cubic meter, and when it is measured in pound per cubic foot then it is range from 150 to 156 lb/ft3 (3600 lbs/ yard in dry mix and 4050 lbs/ yd3 in wet mix) Weight of concrete depends on density of material cement, sand,aggregate are used, water ...

Mix design M35 Grade designed as per IS 10262:2009 & IS …

Mix proportioning for a concrete of M35 grade is given in A·I to A-ll. A·I STIPULATIONS FOR PROPORTIONING. a) Grade designation : M35 b) Type of cement : OPC 53 Grade conforming IS 12269 c) Maximum nominal size of aggregate : 20mm d) Minimum cement content : 340 kg/m 3 (IS 456:2000) e) Maximum water-cement ratio : 0.45 (Table 5 of IS …

Materials Prices

Updated on : August 2023. The following are the rates for the supply and delivery of various building materials to the work sites within the Klang Valley, Malaysia and its vicinity . The rates are based on the prices quoted by subcontractors / suppliers but have not included the on-cost mark-up for profit & attendance by the Main Contractor.

Ready Mixed Concretes

Get Price Quote. Feature : Long Shelf Life, Super Smooth Finish Application : Construction Use Certification : ISI Certified Condition : New Storage : Store in a Dry Place Form : Liquid, Powder details ordinary concrete mixes m10, m15, m20 standard concrete mixes m25, m30, m35, m40, m45, m50 high strength concrete mixes m55, m60, m65, m70, m75, …

How much cement sand & aggregate required for M15 concrete

Wet volume of concrete = 1m3. mix ratio for m15 concrete = 1:2:4. We have to do following calculating steps:- Step 1 :-we have wet volume of concrete is equal to 1 cubic metre (1m3), but when we calculate actual quantity of dry ingredient cement, sand and aggregate of concrete. Dry volume of concrete is equal to 1× 1.54 = 1.54 m3 ( cubic meter)

Calculate Cement Sand & Aggregate from Concrete …

Concrete mix ratio refers to the specific proportions of cement, sand, aggregate, and other components required to create different concrete grades. The nominal mix ratio for M20 Concrete, for instance, …

Brick Archives

Best concrete mix for slab, patio, sidewalk, fence posts and footing. TMT bar weight (8mm, 10mm, 12mm, 16mm & 20mm) 5 inch brick wall calculation | brickwork and brick estimate. Popular Post. Footer. At CivilSir, we share all the information related to civil engineering. So if you are a civil engineering student this is the best platform where ...

Rate analysis for concrete

conclusion:-Rate analysis for concrete 1) Rate per cum for concrete M15 = INR 7537 2) Rate per sq m for concrete M15 = INR 1130 3) Rate per sq …

rate analysis of concrete per cubic meter of m35 grade crusher

Cubic feet in 1 crusher run stone, how many kilograms of sand required in, feet for one cubic meter of m25 grade concrete, concrete rate per cubic meter m20 plan your concrete project carefully there is a set, plan your concrete project, 5 cubic feet mix portland cement and sand at a 12 or 13, add gravel or crushed stone to.

4. ESTIMATING ROAD CONSTRUCTION UNIT COSTS

The earthwork production rate is calculated as the cubic meters per hour which can be excavated and placed divided by the number of cubic meters per km to be excavated. ... Crusher 1.0 90.00 90.00 Stacker 1.0 15.00 15.00 Generator 1.0 20.00 20.00: 251.00 Cost per cubic meter solid rock = $2.90 ...

analysis of concrete per cubic meter of m35 grade crusher

rate analysis of concrete per cubic meter of m35 grade crusher crushing plant ireland Mix Design For M35 Grade Of Concrete Civil Engineering Jul 09, 2017 Select Water Cement Ratio = 043 for concrete grade M35 (From Fig 2 of IS 10262 1982) Select Water Content = 172 Kg (From IS: 10262 for 20 mm nominal size of aggregates Maximum …

concrete cost per cubic meter in india for m35

rate analysis of concrete per cubic meter of m35 grade, rate analysis of concrete per cubic meter of m35 grade « crusher Concrete Rate Per Cubic Meter In India- rate analysis of concrete per cubic meter of m35 grade « crusher,rock crusher gome wild rock crusher 500 cubic metre per day concrete rate per cubic meter m20,pakistan …

How to do Concrete Rate Analysis?

Most of the projects has a specific team of workmen who does the regular concreting work. Estimate the number of workmen in the same team. Also, check what is …

Rate Analysis for civil work Archives

Best concrete mix for slab, patio, sidewalk, fence posts and footing. TMT bar weight (8mm, 10mm, 12mm, 16mm & 20mm) 5 inch brick wall calculation | brickwork and brick estimate. RR Masonry (Random rubble masonry) Popular Post. Footer. At CivilSir, we share all the information related to civil engineering.

Analysis of M35 and M40 grades of concrete by ACI …

Abstract- This paper presents the results of an experimental study conducted to compare the ACI and USBR method of concrete mix design. The M35 and M40 grades of …

Weight of 1 cubic meter of M10, M15, M20 and M25 concrete

The typical weight of 1 cubic meter of M10, M15, M20 & M25 concrete is about 2.5 MT (or 2,500kg), which consists of 350kg (7 50kg bags) cement, 700 kg of sand, 1,200kg of aggregate, about 150 litres of water and 100kg of steel. A typical concrete mix weighs about 150lb (pound) per cubic foot, 68kg per cubic foot, 4,050lb (pound) per cubic yard ...

Rate Analysis of Excavation in Earthwork: August 2023

To calculate excavation costs, multiply the excavated zone's length, width, and depth to estimate its volume. To obtain the cost of excavation, multiply the total excavation volume by the price of the area per unit. If the price per unit is $8, then the total price will be; Total price= 300*8=$2400.

M30 Grade of Concrete Mix Design Procedure with OPC 53 …

Selection of Water Cement Ratio for M30 Grade of Concrete Mix design. Maximum Water Cement Ratio Permitted As per MORTH Clause – 1715.2: 0.40; W/c Ratio Selected As 0.39; Selection of Water for M30 Grade of Concrete Mix Design Water Content as per Table 2, of IS: 10262:2009 for 20 mm maximum size of aggregate IS: 186 litres.

calculation of rate analysis of concrete m20

calculate sand quantity for rcc m20 grade concrete - YouTube, Rate Analysis Of Concrete Per Cubic Meter Of M35 Grade Crusher How Much Cement Per, .... How to find out whether concrete is m25 or m30. How do you find out whether concrete is m25 or m30?, we can calculate the compressive strength of the, What is the rate of M20 and …

Project on Concrete Mix Design for various grades of Concrete

Project on Concrete Mix Design for various grades of Concrete. AIM: To Calculate the Concrete Mix Design for M35 grade concrete with fly ash & M50 grade concrete without Fly ash INTRODUCTION: Concrete mix design is the method of finding the precise proportion of cement, sand and aggregates for concrete to achieve the …

Introduction of Cost of Concrete Per Cubic Meter

To calculate the concrete rate per 1 m 3, consider a concrete mix of M 20.The ratio of M20 grade concrete is (1:1.5:3) where 1 is a part of cement,1.5 is the part of fine aggregate and 3 is the part of coarse aggregate.. Let us take the water-cement ratio for the mixing of the concrete is 0.45 and the maximum size of the aggregate that is used in the …

How to Calculate Quantities of Cement, Sand and Aggregate for

Considering concrete density = 2400 kg/cum, One bag of cement and other ingredients can produce = 400/2400 = 0.167 Cum of concrete (1:2:4) 01 bag cement yield = 0.167 cum concrete with a proportion of 1:2:4. 01 cum of concrete will require. Cement required = 1/0.167 = 5.98 Bags ~ 6 Bags. Sand required = 115/0.167 = 688 Kgs or 14.98 cft

Calculate Cement Sand & Aggregate – M20, M15, M10, M5 Ratio

To produce high-quality concrete, it is essential to determine the correct quantities of materials and mix them in the proper proportions. This article provides simple methods for calculating the amounts of cement, sand, coarse aggregate (such as stone or jalli), and water required to prepare different types of concrete, including M5, M7.5, M10, …

how many kg of cement in a cubic meter of concrete m35

Cement Crusher Gravel Cubic Meter. how much quantity cement in 1 cubic meter concrete in m25, Rate Analysis Of Concrete Per Cubic Meter Of M35 Grade, how many kg is a cubic meter,...

fck of concrete (characteristic of compressive strength)

M35 grade of concrete, in which M stand for mix and numerical figure 35 is stand for characteristics of compressive strength, so fck value for M35 concrete is 35 N/mm2 or 35 m.pascal. fck value for M40: The fck value for M40 concrete is about 40 MPa (40 N/mm2) after 28 days, 36 MPa (36 N/mm2) after 14 days, 26 MPa (26 N/mm2) after 7 days and 16 ...

Rate Analysis of Concrete – Explanation

1. Estimation of Materials Assume We need 1 m3 of wet volume concrete of M25 Mix, (Mix Ratio, M25 = 1: 1 : 2) So Total Parts = 1+1+2 = 4 Parts which gives Dry volume that means before adding water content Volume of …

Rate analysis for PCC 1:4:8 (M7.5) – calculate quantity & cost

The typical production rate of 1 m2 (square meter) PCC (plane cement concrete) with a mix ratio of 1:4:8 is about 900 rupees. Typical PCC rate is around Rs. 900 per m2 (square meter) at a 1:4:8 mix (M7.5). Consider thickness of concrete structure is 150mm thick so Area of concrete structure in square metre = 1m3/0.15m = 6.67, 6.67 m2 concrete ...